category | !! | !! | fill, dumping, collapse | [Input File: !!] |
definition (typological label) | 2006-8-15 | eDB | fill | [Input File: Qx06eI.j] |
summary | 2012-10-07 | jW | Lower of two fills of pit a5 in k13. | [Input File: Wx07jW1.j] |
best image | !! | !! | p22 | [Input File: !!] |
description (summary) | 2006-10-09 | jW | Bottom of two fills of pit a5, cut into the baqaya glacis, f109, before it was covered by the wahal glacis. As with the top fill, the contents provided little evidence of the purpose for which the pit was dug. Because this fill was so hard, it may be the top of a number of compacted fills used to construct the temple mound behind the revetment wall, before the slope was covered with baqaya. | [Input File: Qx09jW.j] |
best view | 2007-4-03 | jW | v63 | [Input File: R403jW.j] |
relays (applicable to elements) | 2006-8-20 | eDB | 636 (41464 49183 - 9218 / Relay location: NE corner) | [Input File: Q824JW2R.J] |
2006-8-20 | eDB | 637 (41438 49180 - 9218 / Relay location: E corner) | [Input File: Q824JW2R.J] | |
2006-8-20 | eDB | 638 (41284 49202 - 9215 / Relay location: SE corner) | [Input File: Q824JW2R.J] | |
2006-8-19 | eDB | 623 (41515 49140 - 9234 / Relay location: NW corner) | [Input File: Q824JW2R.J] | |
2006-8-20 | eDB | 639 (41431 49110 - 9223 / Relay location: SW corner) | [Input File: Q824JW2R.J] | |
2006-8-26 | eDB | 823 (41534 49146 - / Relay location: NW corner) | [Input File: Q827EB3R.J] | |
2006-8-26 | eDB | 824 (41482 49202 - / Relay location: NE corner) | [Input File: Q827EB3R.J] | |
2006-8-26 | eDB | 825 (41407 49177 - / Relay location: SW corner) | [Input File: Q827EB3R.J] | |
2007-3-02 | jW | 826 (41276 49160 - / Relay location: SW corner) | [Input File: R302JW5R.J] | |
2007-3-17 | jW | 2587 (41383 49151 - / Relay location: SW corner) | [Input File: R317JW-R.J] | |
m#/elev @top | 2006-8-15 | eDB | 9200 | [Input File: Qx06eI.j] |
m#/elev @bottom | 2006-8-15 | eDB | m4318 | [Input File: Qx06eI.j] |
height @bottom | 2006-8-15 | eDB | 62 | [Input File: Qx06eI.j] |
h-eye @bottom | 2006-8-15 | eDB | 160 | [Input File: Qx06eI.j] |
elevation | 2010-8-19 | mM1 | 9200 @ top (corrected) | [Input File: U819mM1.j] |
2010-8-19 | mM1 | 9213 @ bottom (corrected) | [Input File: U819mM1.j] | |
notes on volumetric localization | 2010-8-17 | mM1 | the measured bottom elevation (9213) exceeds the top elevation (9200), which is impossible. q247, which sits in f172, has a top elevation of 9213, while f128 (a pit), in which f127 is sitting, has a bottom elevation of 9200. Therefore I conclude that the measurements of the top and of the bottom are reversed. The bottom elevation should be 9200, while the top elevation should have a measurement 9213. | [Input File: U817mM1.j] |
type of contact: contemporary events/movable items | 2006-8-28 | bL | q247 (pottery) sits in f127 (fill) | [Input File: Q829jW1.j] |
2006-8-28 | bL | [Input File: Qx02jW.j] | ||
2006-10-04 | jW | f127 (fill) sits in f128 (pit cut) | [Input File: Qx04jW1.j] |
stratum (to which element belongs) | 2012-9-09 | jW | s190J3B | [Input File: W909jW.j] |
stratigraphic reasons of assignment | 2012-10-07 | jW | Lower of two fills of pit a5 dug into the EDIII glacis. | [Input File: Wx07jW.j] |
typological reasons for assignment | 2012-10-07 | jW | Ceramics have not been fully analyzed. | [Input File: Wx07jW.j] |
other reasons, reservations, qualifications | 2012-10-07 | jW | Pit fill was covered by fill f122. Preliminarily dated to the early Mittani period because that is when the area above the glacis seems to have lost its sacred function. | [Input File: Wx07jW.j] |
phase (to which element belongs) | 2012-9-09 | jW | h7cJ3B | [Input File: W909jW.j] |
strata (included within phase) | 2012-10-07 | jW | s190J3B | [Input File: Wx07jW.j] |
view/drawing of features |
|