Daily |
2004-7-11 | aP |
we started to excavate this new squares removing for the moment the top soil ( f50, q109).
|
|
2004-7-12 | aP |
We are going on removing top soil ( f50, q116 and q121). Tomorrow we are thinking to concentrate two pick-man to reach, as soon as possible, the steps of the monumental also in k83.
|
|
2004-7-13 | aP |
we are going down trying to reach, as soon as possible, the steps. We are excavating the feature below top soil f62, q131 in all the square and f62, q142 in the northern half.
|
|
2004-7-14 | aP |
we started to remove the southern half of the square ( f62, q148) and we went on in all the surface ( f62, q149). We decided to go on above all in the northern part ( f62, q153) with the goal of reaching, as soon as possible, the steps of the stair.
|
|
2004-7-15 | aP |
we started removing the southern half ( f62, q162), going down in all the square ( f62, q165) and in the northern half ( f62, q168, q171). We found some eroded stones of big size.
|
|
2004-7-18 | aP |
we are going down with the excavation of f62 ( q176, q183) in all the squares. Many eroded stones of big size are coming out but for the moment no trace of steps.
|
|
2004-7-19 | aP |
we are going down in all the square digging between the eroded stones, looking to reach the western steps of the stair ( f62, q191, q198).
|
|
2004-7-20 | aP |
we went down in all the square ( f62, q202) but we stopped since it was difficult excavating between the eroded stones which now occupy all the surface of the square.
|
|
2004-7-27 | aP |
we continued to remove the columns of soil under the collapsed stones, levelling at the same time all the surface of the unit ( f107, q294 and q307).
|